{"id":15565,"date":"2021-10-08T16:40:28","date_gmt":"2021-10-08T16:40:28","guid":{"rendered":"https:\/\/ul.edu.lr\/?p=15565"},"modified":"2021-10-08T16:40:28","modified_gmt":"2021-10-08T16:40:28","slug":"ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation","status":"publish","type":"post","link":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/","title":{"rendered":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE)\u00a0 and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Chaired by UL President Rev. Prof. Dr. Julius Julukon Sarwolo Nelson, Jr., on UL Capitol Hill Campus, the meeting was held to provide the various institutions an accurate assessment of the tasks and enable them set priorities within the scope of agreed timeline and in consideration of the reopening of school. In a PowerPoint presentation, the Vice President for Administration, Madam Benetta Joko Tarr, laid out the University\u2019s priority targets for the planned renovation. She explained that they include meeting water and sanitation needs, renovation of buildings and rehabilitation of roads, furniture for classes and offices, among others, with an estimated cost at over US$3m.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-15567\" src=\"https:\/\/ul.edu.lr\/wp-content\/uploads\/2021\/10\/DSC_8364.jpg\" alt=\"\" width=\"1000\" height=\"667\" \/><\/span><\/p>\n<p><span style=\"font-weight: 400;\">The AFL Engineering Battalion, LACE, Ministry of Public Works and General Services Agency delegations in separate remarks pledged unflinching commitments and dedication to work with the University of Liberia in carrying out the renovation works on its four campuses. Acting Public Works Minister, Madam Ruth Cooker-Collins said the\u00a0 renovation exercise will be broken into phases with multiple priorities, each of which would be selectively tackled by one of the implementing institutions involved in the process. LACE Executive Director, Mr. Pepci Quiwu Yeke, advised the team and UL Administration to focus on critical infrastructure that have high utility value to the students who will be returning to the campuses after the weekend.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The AFL Engineering Battalion at the meeting included its commander, Maj. John Borh Kokulo; First Sergeant Rishino G. Samuels; First Sergeant Ezekiel W. Toe and Engineering Special Sergeant Morgan A. Richards.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Other representatives of the University of Liberia\u2019s Administration were Atty. Norris L. Tweah, Vice President for University Relations; Mr. John Boimah, Resident Engineer; and Mr. Jefferson Walker, Director of Plant Operation Division (POD).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Technicians from the different institutions agreed to commence their technical assessments on Friday, October 8, 2021 and high priority renovation work is expected to begin this weekend.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE)\u00a0 and the General Services Agency (GSA) on the renovation of its four campuses [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"iawp_total_views":7,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-15565","post","type-post","status-publish","format-standard","hentry","category-news"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Thomas Karyah\"\/>\n\t<meta name=\"google-site-verification\" content=\"l2RuqWS_Pf5yi5lBc0xw2z59SDG0LqNkLC3pCfdm0Lo\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"University of Liberia | Lux In Tenebris\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia\" \/>\n\t\t<meta property=\"og:description\" content=\"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t\t<meta property=\"og:image:height\" content=\"105\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2021-10-08T16:40:28+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-10-08T16:40:28+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theuniversityofliberia\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#blogposting\",\"name\":\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia\",\"headline\":\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation\",\"author\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/author\\\/474d7bd78c00a655\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/DSC_8364.jpg\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#articleImage\"},\"datePublished\":\"2021-10-08T16:40:28+00:00\",\"dateModified\":\"2021-10-08T16:40:28+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#webpage\"},\"articleSection\":\"News\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ul.edu.lr\\\/new\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/category\\\/news\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/category\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#listItem\",\"name\":\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#listItem\",\"position\":3,\"name\":\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/#organization\",\"name\":\"University of Liberia\",\"description\":\"Lux In Tenebris\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/images.jpg\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#organizationLogo\",\"width\":300,\"height\":109},\"image\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/theuniversityofliberia\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@universityofliberia6248\\\/videos\",\"https:\\\/\\\/lr.linkedin.com\\\/company\\\/university-of-liberia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/author\\\/474d7bd78c00a655\\\/#author\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/author\\\/474d7bd78c00a655\\\/\",\"name\":\"Thomas Karyah\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/283c3c3614633d4f7713612af281fc31d0824c049a0b14379583c21dc2d30815?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Thomas Karyah\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#webpage\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/\",\"name\":\"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia\",\"description\":\"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/author\\\/474d7bd78c00a655\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/author\\\/474d7bd78c00a655\\\/#author\"},\"datePublished\":\"2021-10-08T16:40:28+00:00\",\"dateModified\":\"2021-10-08T16:40:28+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/#website\",\"url\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/\",\"name\":\"University of Liberia\",\"description\":\"Lux In Tenebris\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/ul.edu.lr\\\/new\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia","description":"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.","canonical_url":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"l2RuqWS_Pf5yi5lBc0xw2z59SDG0LqNkLC3pCfdm0Lo","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#blogposting","name":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia","headline":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation","author":{"@id":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/#author"},"publisher":{"@id":"https:\/\/ul.edu.lr\/new\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/ul.edu.lr\/wp-content\/uploads\/2021\/10\/DSC_8364.jpg","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#articleImage"},"datePublished":"2021-10-08T16:40:28+00:00","dateModified":"2021-10-08T16:40:28+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#webpage"},"isPartOf":{"@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#webpage"},"articleSection":"News"},{"@type":"BreadcrumbList","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new#listItem","position":1,"name":"Home","item":"https:\/\/ul.edu.lr\/new","nextItem":{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new\/category\/news\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new\/category\/news\/#listItem","position":2,"name":"News","item":"https:\/\/ul.edu.lr\/new\/category\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#listItem","name":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#listItem","position":3,"name":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation","previousItem":{"@type":"ListItem","@id":"https:\/\/ul.edu.lr\/new\/category\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/ul.edu.lr\/new\/#organization","name":"University of Liberia","description":"Lux In Tenebris","url":"https:\/\/ul.edu.lr\/new\/","logo":{"@type":"ImageObject","url":"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/05\/images.jpg","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#organizationLogo","width":300,"height":109},"image":{"@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/theuniversityofliberia\/","https:\/\/www.youtube.com\/@universityofliberia6248\/videos","https:\/\/lr.linkedin.com\/company\/university-of-liberia"]},{"@type":"Person","@id":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/#author","url":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/","name":"Thomas Karyah","image":{"@type":"ImageObject","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/283c3c3614633d4f7713612af281fc31d0824c049a0b14379583c21dc2d30815?s=96&d=mm&r=g","width":96,"height":96,"caption":"Thomas Karyah"}},{"@type":"WebPage","@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#webpage","url":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/","name":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia","description":"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/ul.edu.lr\/new\/#website"},"breadcrumb":{"@id":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/#breadcrumblist"},"author":{"@id":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/#author"},"creator":{"@id":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/#author"},"datePublished":"2021-10-08T16:40:28+00:00","dateModified":"2021-10-08T16:40:28+00:00"},{"@type":"WebSite","@id":"https:\/\/ul.edu.lr\/new\/#website","url":"https:\/\/ul.edu.lr\/new\/","name":"University of Liberia","description":"Lux In Tenebris","inLanguage":"en-US","publisher":{"@id":"https:\/\/ul.edu.lr\/new\/#organization"}}]},"og:locale":"en_US","og:site_name":"University of Liberia | Lux In Tenebris","og:type":"article","og:title":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia","og:description":"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.","og:url":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/","og:image":"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png","og:image:secure_url":"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png","og:image:width":300,"og:image:height":105,"article:published_time":"2021-10-08T16:40:28+00:00","article:modified_time":"2021-10-08T16:40:28+00:00","article:publisher":"https:\/\/www.facebook.com\/theuniversityofliberia\/","twitter:card":"summary_large_image","twitter:title":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation | University of Liberia","twitter:description":"The University of Liberia (UL) Administration on Thursday, October 7, 2021, met with the Armed Forces of Liberia (AFL) Engineering Battalion, the Ministry of Public Works, Liberia Agency for Community Empowerment (LACE) and the General Services Agency (GSA) on the renovation of its four campuses as indicated in the October 1, 2021 Memorandum of Understanding.","twitter:image":"https:\/\/ul.edu.lr\/new\/wp-content\/uploads\/2024\/03\/university_of_liberia_logo.png"},"aioseo_meta_data":{"post_id":"15565","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-07-11 21:49:58","updated":"2025-06-05 03:46:37","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ul.edu.lr\/new\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/ul.edu.lr\/new\/category\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tUL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/ul.edu.lr\/new"},{"label":"News","link":"https:\/\/ul.edu.lr\/new\/category\/news\/"},{"label":"UL Meets AFL Engineering Battalion, Public Works, GSA on Campus Renovation","link":"https:\/\/ul.edu.lr\/new\/ul-meets-afl-engineering-battalion-public-works-gsa-on-campus-renovation\/"}],"featured_image_src":null,"author_info":{"display_name":"Thomas Karyah","author_link":"https:\/\/ul.edu.lr\/new\/author\/474d7bd78c00a655\/"},"_links":{"self":[{"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/posts\/15565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/comments?post=15565"}],"version-history":[{"count":0,"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/posts\/15565\/revisions"}],"wp:attachment":[{"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/media?parent=15565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/categories?post=15565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ul.edu.lr\/new\/wp-json\/wp\/v2\/tags?post=15565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}